Investment project of waste treatment complex, industrial wastes and organic fertilizer production in Hau Giang.

– Scale:

+ Domestic waste treatment: 250 – 300 tons of rubbish per day.

+ Medical treatment, hazardous and non-hazardous industry: 70-100 tons / day.

– Location of the project: Vi Thanh district, Hau Giang province.

– Land area used: 40 ha.

– Total investment capital: 300 billion VND (Three hundred billion VND)

With the capacity and investment plans that Da Loc Trading and Construction Co., Ltd has studied, ensuring the project will operate effectively, stable and ensure the need of funeral for the people of the city. as well as the development of the original orientation of the company.